Construction Procurement Routes
Who designs, who builds and who carries the risk. Compares traditional, design and build, two-stage, management routes and frameworks, with a worked comparison.
Who designs, who builds and who carries the risk. Compares traditional, design and build, two-stage, management routes and frameworks, with a worked comparison.
Design to a budget, not budget after the design. Follows NRM 1 from order of cost estimate to pre-tender estimate, with a priced elemental cost plan and BCIS benchmarking.
Measuring a two-storey house to NRM 2, work section by work section. Shows how a bill of quantities is organised and what changed from SMM7.
Why carbon now sits beside capital cost. Covers embodied carbon, whole-life costing, sustainable procurement, BREEAM and regulation, with a worked school example.
Convert between metric and imperial units used in construction, including cost rates. Quick conversions and a reference table for everyday QS work.
The main contract types explained for QSs, from lump sum and remeasurement to target cost and cost reimbursable. Shows how each shares risk and maps to JCT, NEC4 and FIDIC.
Checking tenders before award. Covers front-loading, preliminaries, provisional sums, abnormally low bids, MEAT scoring and the tender report, with a worked £22 million example.
Part 6. Managing uncertainty from risk register to cost plan. Covers quantifying risk, categories of construction risk, contractual allocation and how to correct for optimism bias.
Part 5. Why construction disputes arise and how to stop them escalating. Covers avoidance, the main resolution routes, types of claim and the QS role throughout.
Part 4. Keeping the project within budget once work starts on site. Covers the cost plan baseline, cost reports, the variation log, earned value and value engineering.