Post-Contract Cost Management
Introduction Pre-contract cost planning sets the budget. Post-contract cost management keeps the project on it. From the moment the contract…
Practical guides, worked examples and industry insights for Quantity Surveyors and construction professionals.
Introduction Pre-contract cost planning sets the budget. Post-contract cost management keeps the project on it. From the moment the contract…
Introduction Construction projects are inherently vulnerable to inflation. They span months or years from initial cost estimate through design, tendering,…
Introduction The construction programme is not just a scheduling tool — it is the single most important commercial document on…
Introduction When a construction project is delayed or disrupted by events that are the employer’s risk, the contractor may be…
Introduction FIDIC — the Fédération Internationale des Ingénieurs-Conseils — is the international federation of consulting engineers, founded in 1913 and…
The RICS framework for order of cost estimating and elemental cost planning Introduction NRM 1 — the RICS New Rules…
Introduction Delays are an unavoidable feature of construction projects. When they occur, the contract must determine who bears the risk…
Introduction The NEC4 Engineering and Construction Contract (ECC) is the UK’s leading collaborative construction contract, used extensively on infrastructure, civil…
Introduction Construction projects carry inherent risk — contractor insolvency, defective work, failure to complete. Bonds, guarantees, and warranties are the…
Updated April 2026 — a complete guide to construction preliminaries for UK quantity surveyors, commercial managers and students. Covers NRM…