Bonds, Guarantees, and Warranties in Construction
Protecting the client if things go wrong. Covers performance and advance payment bonds, parent company guarantees, collateral warranties, latent defects insurance and their cost.
Protecting the client if things go wrong. Covers performance and advance payment bonds, parent company guarantees, collateral warranties, latent defects insurance and their cost.
The site-wide costs no single trade carries. Covers NRM 2 structure, fixed and time-related charges, typical percentages by sector and a worked £5 million office example.
How retention works and why it's so contested. Covers release stages, JCT and NEC4 approaches, the trust problem, alternatives to cash retention and reform.
The engine of construction cash flow. Covers the legal framework, valuations under JCT and NEC4, the gross valuation method, retention, payment notices and a worked example.
What compliance costs and how to plan for it. Covers the Approved Documents, the Building Safety Act, building control fees and a six versus seven storey cost scenario.
The skill all cost work rests on. Covers drawing types, plans, sections and elevations, title blocks, symbols, dimensions, scales and abbreviations, with worked examples.
The legal framework every QS works within. Covers the Construction Act, payment under NEC4 and JCT, adjudication, retention and a worked interim payment dispute.
Work out bricks, mortar and wastage for any wall. Enter the dimensions, wall type and openings to get quantities and an estimated cost, using UK standard brick sizes.
Testing whether a scheme is worth building. Covers the residual method, phased cash flow, sensitivity analysis, viability assessments for planning and the QS role throughout.
Is the project worth building? Covers the QS role at feasibility, early cost estimates, development appraisal, abnormal costs and a worked residential example